House Notes: Difference between revisions

From Federal Burro of Information
Jump to navigationJump to search
No edit summary
Line 44: Line 44:
* concrete to wall
* concrete to wall
** use vertical 2X4 with marks and laser level to get rough floor at correct height.
** use vertical 2X4 with marks and laser level to get rough floor at correct height.
** also possible: grade stakes: rebar plunge down so tht the top of the rebar is at the desired high, making scree more accurate.
** floats
** floats
* surfacer
* surfacer

Revision as of 04:37, 24 June 2021

Basement:

1. clean out

2. tear up floor

redo walls

refinish brick:

redo floor:

video: https://www.youtube.com/watch?v=Ii0pcTkCIWE

dig basement

  • extra steps
  • hung furnace


https://www.youtube.com/watch?v=JuIy5h3qqlE

pour floor:

https://www.youtube.com/watch?v=D8cqLR3kFgs


https://www.youtube.com/watch?v=Vvm8v2KXIGo

Floor Pooring

  • dimple board on wall first.
  • trench
  • french drain
  • release hole
  • gravel base
    • Leveling laser, 2X4 board to get gravel level.
      • Level the 2X4s first then pour the gravel.
  • tamp
  • vapour barrier
  • wire mesh
  • concrete to wall
    • use vertical 2X4 with marks and laser level to get rough floor at correct height.
    • also possible: grade stakes: rebar plunge down so tht the top of the rebar is at the desired high, making scree more accurate.
    • floats
  • surfacer